What ground sample distance do you need to map parcel slope for solar siting?

If you've started pulling resolution specs for a regional slope screen, you've probably noticed the numbers all over the place. Some vendors quote 30 cm. Some quote 10 m DEM tiles pulled off a public source. Neither answer is wrong, exactly. They're answering different questions.
The short answer for parcel-level slope screening at the acquisition stage: 0.5 to 2 meters is the working range. That's tight enough to catch the terrain breaks that sink a parcel, and coarse enough to run across a whole county or utility territory without the data volume or the processing time becoming the project.
GSD isn't the same thing as slope accuracy
Ground sample distance describes the pixel size of the source imagery or elevation surface. The processing pipeline behind that imagery, the orthorectification, the registration, the DEM extraction method, is what actually determines how closely the derived slope value tracks reality. A 2 m DEM built from clean, well-registered imagery can produce a usable slope layer. A 1 m DEM built from noisy or poorly orthorectified source data can produce garbage, full of false slope spikes at every shadow edge and tree line.
So the question "what GSD do I need" is really two questions stacked together: what pixel size captures the terrain features at the scale you care about, and what's the quality of the processing pipeline behind it. A land acquisition manager screening 40,000 acres doesn't have time to audit pipelines parcel by parcel. That's the part worth pushing a vendor on, more than the headline resolution number.
What resolution actually matters at the screening stage
At the ranking stage, before anyone starts designing racking layouts, the terrain features that matter are broad: whether the parcel sits on a rolling grade under roughly 5-8%, whether it has a ridge or drainage cut running through it, whether the aspect works for the panel orientation you'd want. Those features show up fine at 1-2 m. You don't need to resolve a 30 cm berm or a single drainage swale to decide whether a 200-acre parcel is worth a site visit.
Sub-meter imagery and cm-level LiDAR earn their keep later, once a parcel has cleared the first cut and an engineering team is grading pad locations and running cut-and-fill estimates. Paying for that resolution across a whole screening region, before you know which parcels survive the first filter, means buying precision you'll throw away on the parcels that get excluded anyway.
The same logic applies to cadence. A DEM and land-cover layer from 18 months ago is usually fine for a slope and aspect screen, since terrain doesn't move. It's a weaker answer for land cover and water boundary checks on parcels near active development, which is one reason to pull a fresh pass before committing to a shortlist rather than reusing whatever layer happens to be lying around.
Matching resolution to the decision you're actually making
If the deliverable at the end is a region-wide table of parcels marked pass or fail on slope, aspect, size, shape, land cover, and flood exclusion, high-res multispectral satellite imagery in the 0.5-2 m range covers it without the turnaround time or cost of commissioning aerial LiDAR over every candidate parcel up front. That's the resolution tier Solar Site Screening runs on to produce that parcel table from imagery, annually or on request per region, which is the point where most land teams are still doing this cross-reference by hand across separate slope, land-cover, and flood-zone layers.